How long does the pool building process take?

Once an on site inspection has been performed, a written quotation is usually returned within one week of the consultation.

Upon acceptance of the quotation, work commences immediately on the plans, engineered drawings and planning approvals. This could take 4-6 weeks or even longer depending upon delays with the council approving your plan.

The construction itself can take anywhere between 3 and 6 weeks. Generally the overall pool building process can vary from 8 to 16 weeks.

Pre-approved pools requiring shell-only construction ;(dig, form, steel and concrete) take 4 to 7 days to be completed.

Can I have an online quote?

Quotations are not normally made via email unless prior contact is made to George on 0427 302 244. Detailed plans must be sent in order to achieve an accurate quotation of the proposed pool. A site inspection is always recommended to determine site access, soil types and any limitations which may affect the final price.

What is is our email address?